Tetraclad stripped the existing cladding and sheathing board and replaced with Versaliner, Rockwool Duoslab with their OSCB fire barriers and Rockpanel SF Xtra cladding board to match the original. The project was delivered on time and within budget. Engie were also able to recycle 150 m3 of the original insulation from this project.